Local education authority supply of a purpose built double classroom facility.
This building was designed with the input from the architect to accommodate pupils from Year 11 with a facility to learn outside of the main school building.
Shared entrance and lobby.
Store areas.
2 Open plan classrooms (carpet tiled).
As part of the turnkey contract Procomm supplied High Tunstall School with emergency lighting, fire alarm system, foundations and DDA steps c/w ramp. A contract lift with a crane company was also arranged out of school hours in order to complete the install with minimum disturbance to the school.
For further details please do not hesitate to contact us.